about 9AM, the lake-facing wall mostly has been removed |
about 9AM, another view of the lower porch with the lake-facing
wall gone.
|
about 11 AM, a supporting 2x12 has been placed across
the lower spar. |
|
|
|
about 3 PM, the Northeast wall is gone except for
the cinder blocks. |
about 3 PM, a view to the lake from the lower porch
down to the lake.
|
about 3PM, work continues on the lower porch. Note
the replaced 2x12 on the left. |
|
|
|
about 6PM, a view across the lower porch. Note that
all walls are gone and the near support has been moved. |
about 6PM, a view from the South into the lower porch.
Note that there is a new footer on the lake facing sice and that the door
has been framed in.
|
about 6PM, a close-up view of the northwest wall.
Note that a support for North Corner is now in place. |
|
|
|
about 6PM, inside the porch. Note the footer and that
the old supports are still in use |
about 6PM, one of the old supports has been moved
inward slightly.
|
about 6 PM, dating the new support for the new pillar
to go in. |
|
|
|
About 9AM, one of the original supports has turned
up bent outside the frame and buried under a foot of dirt! |
about 9AM, turning around 180 degrees. Note that the
blocks have been removed. |
about noon, the windows facing the lake have been
framed in. |
|
|
|
about 6PM, the Northeast Wall has been put in place and covered. |
about 6PM, a view from inside the lower porch to the
North. Note the new header across the lake facing. |
about 6PM, a view to the West from the lower porch to the grill.
Note the new header across the open area. |
|
|
|
|
|
|
|
|
|
|
|
|
Come back for more as the days move on.